There is a definite relationship between Time and Work. In this concept, there are only three factors:
There is a fundamental relationship between these three, discussed as follows:
Work done(W) = Number of days(Time taken)(T or D) times Number of men(M)
More number of men can do more work i.e. both are directly proportional
More number of men take less time to complete certain job i.e. both are inversely proportional
By summarizing, we get
Lets start solving some examples:
Example1: 10 men can cut 8trees in 16 days. In how many days can 6men cut 10trees?
Solution: This is a very simple example. You are given:
Using formula,
This means, "How much work one person can do in one day (expressed in percentage)"
For example: A person can do a job in 2days
This concept involves two steps to calculate efficiency:
Try the following example first, then re-read above points
Example2: If a person can complete his work in 5 days. What will be his efficiency?
Solution: Number of days a person take to complete his work = 5
Convert it into percentage:
Therefore, his efficiency is 20%.
Summarizing, If a person can do his job in n days, efficiency will be
Efficiency
For Example: Positive efficiency
As we all know, in competitive exams time management is very important. I suggest you to learn the fractions till 15.
Number of days required to complete work | Work/Day | Efficiency (%) |
N | ||
1 | 1 | 100 |
2 | 50 | |
3 | 33.33 | |
4 | 25 | |
5 | 20 | |
6 | 16.66 | |
7 | 14.28 | |
8 | 12.5 | |
9 | 11.11 | |
10 | 10 | |
11 | 9.09 | |
12 | 8.33 | |
13 | 7.69 | |
14 | 7.14 | |
15 | 6.66 |
Example3: A can do a job in 10 days. B can do a job in 5 days. In how many days they can complete the job if they work together?
Solution: Consider the above table
A's efficiency
B's efficiency
A+ B efficiency
This means, In one day A and B together can do 30% of work.
Therefore,Number of days A and B together take to do 100% of work
Example4: A and B together can do a job in 4 days. If A can do job in 12 days if he works alone, then how many days B alone take to complete the job?
Solution: A+B take = 4 days
A takes = 12 days
B's efficiency
This means, B can do 16.66% work in one day
Therefore, to complete the job he will take
Example5: A and B can do job in 8 days. B and C can do same job in 12 days. A, B and C together can do same job in 6 days. In how many days A and C together can complete the job?
Solution: You are given that:
A+B's efficiency
B+C's efficiency
A+B+C's efficiency
we need to find A+C
Consider,
Therefore, A and C takes
Hope you all understand this topic. I will soon update questions for your practice.
The product of the ages, in years, of three (3) teenagers os 4590. None of the have the sane age. What are the ages of the teenagers???
Use the row of numbers shown below to generate 12 random numbers between 01 and 99
78038 18022 84755 23146 12720 70910 49732 79606
Starting at the beginning of the row, what are the first 12 numbers between 01 and 99 in the sample?
How many different 10 letter words (real or imaginary) can be formed from the following letters
H,T,G,B,X,X,T,L,N,J.
Is every straight line the graph of a function?
For the 1s orbital of the Hydrogen atom, the radial wave function is given as: (Where ∘A)
The ratio of radial probability density of finding an electron at to the radial probability density of finding an electron at the nucleus is given as (). Calculate the value of (x+y).
Find the sets and if and . Are they unique?
What are the characteristics of a good hypothesis?
If x is 60% of y, find .
A)
B)
C)
D)
The numbers of significant figures in are:
A)Two
B)Three
C)Ten
D)Thirty one
What is positive acceleration?
Is power scalar or vector?
What is the five-step process for hypothesis testing?
How to calculate Type 1 error and Type 2 error probabilities?
How long will it take to drive 450 km if you are driving at a speed of 50 km per hour?
1) 9 Hours
2) 3.5 Hours
3) 6 Hours
4) 12.5 Hours
What is the square root of 106?