a) A low voltage transformer manufacturing line has a purchase order o

Ronnie Baur

Ronnie Baur

Answered question

2021-11-16

a) A low voltage transformer manufacturing line has a purchase order of 1700 piece, If the manufacturing line production rate is 22 piece per minute use dimensional analysis techniques to determine the time taken to produce the requested transformers tothe nearest minut in hours and minutes.
b) Assume that the production time of a transformer can be given by the following formals:
t=Gm13v3l2
Where m is the mass of the transformer in kg, v is the velocity of the manufacturing line in ms and l is the length of the production line in meters. Find the diamensions of G.
c) In b, if m=220 grams, l=10.2m, v=2.3ms and time is 30.1 ms. Find G?

Answer & Explanation

Wriedge

Wriedge

Beginner2021-11-17Added 12 answers

Step 1
a) Given
Purchase order =1700piece
Production rate =22piece per minute
So
Time taken to produce the requested transformers =Purchase orderProduction rate
=170022
=77.27min
=1 hour 17.27 min
Step 2
b) Given
t=Gm13v3t2
unit of m=kg ; then dimension of m=M
unit of v=ms ; then dimension of v=LT
ubit of l=m ; then dimension of l=L
dimension of t=T
Now.
G=tm13v3t2
Substituting the dimensions of each variables in the formula of G
G=TM13(LT)3(L)2
G=M13LT3
So, the dimension of G=M13LT3
Step 3
c) Given,
m=220grams=0.22kg
l=10.2m
v=2.3ms
t=30.1ms=30.11000s=0.0301s
we have
G=tm13v3t2
G=0.0301(0.22)13×(2.3)3×(10.2)2
G=0.0301×12.170.60×104.04
G=0.00587kg13ms3

Do you have a similar question?

Recalculate according to your conditions!

New Questions in Multivariable calculus

Ask your question.
Get an expert answer.

Let our experts help you. Answer in as fast as 15 minutes.

Didn't find what you were looking for?