The average length in a sample of 700 steel bar manufactured from oneprocess is found to be 250 kg with a standard deviation of 30 kg while the corresponding values in a sample of 300 bars from the other process are 300kg and 40kg. Is there significant difference between the means of two process at 0.01 level of significance?